Insulation Pipe Saddles

    • Rib & Flare Saddles

    • Flared Edge Saddles

    • Straight Saddles

    •     

      Various Sizes and Guages

     

 
 

      Insulation Block Spacers

      • Fiberglass Block Supports

      • Pinewood Block Supports 

      • Hardwood Block Supports 

      • Packaged - Boxed & Label 

       

       

       

       

 
 

    Insulated Saddles

    • 360° Polyisocyanurate Thermal Saddles

    • 360° Polyisocyanurate Saddles

    • 180° Calcium Silicate Saddles

    • 360° Calcium Silicate Saddles

    •      

      360° High Density Polyisocyanurate Saddles

    • Calcium Silicate Block Inserts

 
 

Tools and Accessories

  • Chip Brushes

  • Knives and Sharpeners

  • Tackers and Staples

  • Addhesive Guns 

  • Tape Measures

  • Scissors and Shears

  • Pliers and Side Cuts

  • Snips and Hand Seamer 

  • Caulk Guns

  • Pipe Calipers

  • Gloves

  • Tool Carriers 

  • Shrink Wraps and Box Tapes 

  • Mechanical Insulation Tapes 

 

Choose your style of Insulation Pipe Saddle Above

 

 

Saddle Features Include:

  • Low economical cost
  • Each saddle individually marked with outside diameter
  • Packaged in strong heavy gauge boxes or square buckets
  • Each package clearly labeled with size, length, gauge and quantity
  • Options of flared edges, alignment ribs, or plain straight saddles
  • In Stock and Ready-to-Ship 2.0 - 12.5 O.D. 
  • Same day or next day shipping on most orders
  • Freight allowed on quantity orders

 

 

 

How To Guide:

Step 1:  ?Place block support into pipe insulation in the location of future pipe saddle and clevis hanger position and cut around the wood block to get the disired size of block.

 

 

 

 

 

 

 

 

Step 2:  ?Pull " Block Section" out of pipe insulation that was done in Step 1.  

 

 

 

 

 

 

 

 

Step 3:  ?Replace the "Block Section" with an IC Block Support into the pipe insulation in the location of future pipe saddle and clevis hanger position.

 

 

 

 

 

 

 

 

Step 4:  ?Wrap the pipe insulation around the Iron Pipe and place in the location of future pipe saddle and clevis hanger position.  

 

 

 

 

 

 

 

 

Step 5:  ?Begin by lifting the appropriately sized IC Saddle upwards towards the insulated pipe to just outside the hanger location. Proceed by sliding the saddle underneath the hanger until the hanger is in the middle of the saddle.